Quotations & Budgets

How to Prepare an Interior Design Quotation in India (Format and Example)

A clear guide to the sections every Indian interior design quotation needs, with an illustrative INR structure, common mistakes and a pre-send checklist.

A quotation is the first document that turns a conversation into a commitment. It tells the client what they are buying, what they are not buying, what it costs, and how it is paid for. A vague quotation invites disputes later; a clear one prevents them.

Illustrative figures onlyEvery price in this article is an example to show structure. They are not market quotations, recommended rates or typical costs. Use your own costing for real projects.

The anatomy of a quotation

A solid quotation has eight parts. You can fit them on two to four pages for a typical apartment.

1. Client and project details

  • Quotation number, date and version (for example Q-2026-014 v2).
  • Client name, contact and site address.
  • Your business name, address, contact and GST registration number if you are registered.
  • Project title: for example "Full home interiors, 3BHK, Tower B, Whitefield".

2. Scope of work

List what is included, room by room. "Modular kitchen" is not scope; "Modular kitchen: L-shaped, 14 running feet base and wall units, acrylic shutters, soft-close hardware, 18 mm carcass" is. Where precision affects price, specify brand, finish and thickness. This also protects you when a client later asks why the quote did not include a loft or a different brand.

3. Itemised quantities and rates

Each line should have a description, unit, quantity, rate and amount. Common Indian units include square feet, running feet, numbers, lump sum and points (for electrical).

Illustrative structure

#ItemUnitQtyRate (₹)Amount (₹)
A. Living and dining
1TV unit with back panel, laminate finishsq ft421,38057,960
2False ceiling with cove lighting channelsq ft26035091,000
B. Kitchen
3Base and wall units, 18 mm carcass, acrylic shuttersr ft1424,0003,36,000
C. Master bedroom
4Wardrobe 8 ft × 7 ft with loftsq ft562,0001,12,000
D. Design and supervision
5Design, drawings and site supervisionlump sum175,00075,000
Sub-total (excl. GST)6,71,960

Notice that every amount is a quantity multiplied by a rate. A client can follow the logic, and you can revise a single line without rebuilding the document.

4. Material and labour costs

Some designers present rates inclusive of material and labour; others separate them. Both work. What matters is consistency and clarity: if a rate includes hardware, say so; if you supply the stone but the client buys the appliances, say that too.

5. Design fees

State whether your design fee is a separate line, a percentage, or embedded in the item rates. Embedded fees make comparisons harder for the client, and separate fees make it easier to remove or reduce the scope later. Pick the approach that matches how you want to be paid, and say it plainly.

6. Exclusions and assumptions

This section is the cheapest insurance you will ever buy. Examples of exclusions:

  • Civil changes, demolition debris removal beyond a stated amount.
  • Appliances, loose furniture, curtains and décor unless listed.
  • Society deposits, permission charges and lift or parking fees.
  • Electricity and water during work.
  • Any item not described in the scope.

And assumptions:

  • Site is available from a stated date and access during working hours is permitted.
  • Walls and floors are in sound condition.
  • Client selections are made by agreed dates.

7. Taxes where applicable

Whether GST applies, what rate applies and how to show it depends on your registration and what you supply. This is a tax question, not a design one, so take it to your chartered accountant, and refer to the official GST portal for current rules. If you show GST on the quotation, show the basis and the amounts clearly. InterioDesk treats GST details as optional.

8. Payment terms, validity, revisions and approval

Payment terms

State the milestones and amounts or percentages, for example advance on signing, further instalments on stage completion, and balance on handover. There is no universally correct schedule; choose one that matches cash flow and client trust, and write it down. See managing payments and milestones.

Validity

Material rates change. State how long the quotation is valid, for example 15 or 30 days, and what happens afterwards.

Revision history

Quotations are revised. Keep version numbers and dates, and keep the older versions. When the client approves, record exactly which version they approved.

Client approval

Decide how a quotation is accepted: a signed copy, a written confirmation or an online approval in a portal. Whatever you choose, store the proof with the project.

Common quotation mistakes

  • Vague scope. "Wardrobe" can mean three different products at three different prices.
  • Missing quantities. A rate without a quantity is not a quotation.
  • No exclusions. The client assumes everything is included.
  • Per-square-foot only. Fine for a first budget, but too blunt to revise or defend.
  • No version control. Two clients, six revisions, one folder called "final".
  • Silent changes after approval. Post-approval additions should become priced change requests. See how to handle extra work.
  • No acceptance record. A thumbs-up emoji is not a record.

A pre-send checklist

  • Quotation number, date and version are correct
  • Client and site details are accurate
  • Scope is described by room with specifications
  • Every line has quantity, rate and amount
  • Totals are checked; GST shown only where applicable
  • Exclusions and assumptions are listed
  • Payment terms and validity are stated
  • Acceptance method is stated
  • PDF opens correctly and is named by version

A printable version with a blank line-item worksheet is on our quotation checklist page.

How software helps without taking over

Spreadsheets are fine for drafting. Where they struggle is memory: which version was approved, by whom, and what changed. A tool such as InterioDesk's quotation software structures the lines, generates a PDF, keeps each version and records the client's approval so the approved quotation becomes the project's original agreement. It does not set your rates, and the numbers remain your professional judgement.

Pricing approaches and how they affect the document

How you price shapes how you write the quotation. None of these approaches is universally right; each has trade-offs you should understand before you choose.

ApproachHow it worksWatch out for
Itemised (quantity × rate)Every item has a quantity and rateMore work to prepare, but easiest to revise and defend
Per square footOne rate for a category, multiplied by areaHides specification differences; hard to revise line by line
Lump sum per roomA fixed price for each roomDisputes if scope inside the room changes
Cost plus feeActual costs plus a designer percentage or feeNeeds trust and transparent records; clients may want a cap

Writing line descriptions that prevent arguments

Compare these two descriptions of the same item:

  • Weak: "Wardrobe, master bedroom."
  • Strong: "Master bedroom wardrobe, 8 ft wide × 7 ft high, 18 mm BWP carcass, laminate shutters (client to select from approved shade card), soft-close hinges and channels, 2 internal drawers, loft excluded."

The strong version tells the client what they get, tells the carpenter what to build and tells you what you promised. It costs a minute to write and can save weeks of discussion.

Using allowances sensibly

When the client has not selected an item, such as lights, tiles or sanitaryware, state an allowance: "Lighting allowance: ₹60,000 (supply only). Selections above this amount will be charged additionally." An allowance makes the quotation complete without pretending to know the choice.

Presenting the total

Show a subtotal by room, then the grand total. Clients like to see where the money goes, and a room-level breakdown lets them trim scope intelligently. If they ask to remove a room, you can reissue the quotation as a new version in minutes.

A short worked revision (illustrative)

VersionChangeTotal (₹)
v1First quotation9,40,000
v2Kitchen shutters changed from acrylic to laminate9,05,000
v3False ceiling removed from one bedroom8,75,000

The client approves v3. If the number is later disputed, v3 is the reference, and the earlier versions explain how the price got there.

Presenting the quotation to the client

The document is only half of the job. How you walk the client through it often decides whether they approve it, negotiate it or take it to a competitor.

  1. Meet or call firstDo not send a quotation cold. Walk through the scope in a short call so the client hears the logic before they see the number.
  2. Lead with scope, not priceStart with what is included, room by room, then the total. A price seen without context is compared with the lowest number the client has heard.
  3. Highlight optionsMark items that can be upgraded or removed, with the price effect. Clients who can trim costs themselves are less likely to ask for a blanket discount.
  4. Explain exclusions aloudSay what is not included and why. It feels awkward, but it prevents the most expensive misunderstandings.
  5. Agree the next step and date"I will send the PDF today; shall we speak on Thursday?" Quotations without a follow-up date drift.

Responding to a request for a discount

Discounts are a business choice, not an obligation. If you do give one, link it to something real: a simpler specification, an earlier start, a larger scope or a faster payment schedule. Then issue a new version at the new price and keep the earlier one. Avoid silently lowering rates, because the client will expect the same on every future change.

Quotation versus agreement

A quotation is an offer. Once the client approves a particular version, it becomes the basis of the agreement, and you should treat it that way: record the approved version, the date and the approver, and set the original contract value. Whether that is enough, or you also need a formal signed contract, depends on your practice and legal advice. Many designers use a short contract that refers to the approved quotation by its number and version.

Keeping a library of standard clauses

Write your exclusions, assumptions, validity and extra-work terms once and reuse them. A small library of tested wording saves time and improves consistency, and when a dispute shows a gap, you fix the wording once for all future quotations.

Conclusion

A good quotation is specific about what is included, honest about what is not, easy to follow and easy to revise. Fill in each of the eight sections, keep versions, and record the client's approval. The effort is small compared with a single disputed extra. Next, learn how to calculate your project budget so the quotation you send also protects your margin.

This article is general guidance, not legal, tax or contractual advice. Example prices are illustrative.

Create and track quotations in InterioDeskBuild itemised quotations, generate a PDF and get the client to approve the exact version online. Start a free trial →

General guidance only. This article is not legal, tax or contractual advice. Speak to a qualified professional about your own agreements and GST position.

Topics: quotation, GST, pricing

Frequently asked questions

What should an interior design quotation include?

Client and project details, scope by room, itemised quantities and rates, design fee, exclusions and assumptions, taxes where applicable, payment terms, validity and how it is accepted.

Should I show material and labour separately?

It depends on how you contract. Some designers quote item-wise with material and labour combined; others separate them. Choose what you can defend clearly and apply it consistently.

How do I price per square foot versus itemised?

Per-square-foot figures are useful for early budgeting, but itemised quotations are easier to revise and defend. Convert to items before the client signs.

Do I have to add GST?

Whether GST applies, and at what rate, depends on your registration and the nature of the supply. Check gst.gov.in or consult your chartered accountant. InterioDesk lets you add GST details optionally.

How long should a quotation be valid?

Material and labour rates move, so state a validity period that reflects your supplier arrangements.

How do I handle a quotation revision?

Issue a new version, keep the earlier ones, and have the client approve a specific version.

Should I include exclusions?

Yes. Exclusions prevent most arguments, for example civil changes, appliances, loose furniture, society charges and electricity during work.

What are common quotation mistakes?

Vague scope, missing quantities, no exclusions, unclear payment terms, and no record of which version was approved.

Are the prices in the example real?

No. All prices in this article are illustrative only and are not market rates or recommendations.

Create and track quotations in InterioDesk

Build itemised quotations, generate a PDF and get the client to approve the exact version online.