A quotation is the first document that turns a conversation into a commitment. It tells the client what they are buying, what they are not buying, what it costs, and how it is paid for. A vague quotation invites disputes later; a clear one prevents them.
The anatomy of a quotation
A solid quotation has eight parts. You can fit them on two to four pages for a typical apartment.
1. Client and project details
- Quotation number, date and version (for example Q-2026-014 v2).
- Client name, contact and site address.
- Your business name, address, contact and GST registration number if you are registered.
- Project title: for example "Full home interiors, 3BHK, Tower B, Whitefield".
2. Scope of work
List what is included, room by room. "Modular kitchen" is not scope; "Modular kitchen: L-shaped, 14 running feet base and wall units, acrylic shutters, soft-close hardware, 18 mm carcass" is. Where precision affects price, specify brand, finish and thickness. This also protects you when a client later asks why the quote did not include a loft or a different brand.
3. Itemised quantities and rates
Each line should have a description, unit, quantity, rate and amount. Common Indian units include square feet, running feet, numbers, lump sum and points (for electrical).
Illustrative structure
| # | Item | Unit | Qty | Rate (₹) | Amount (₹) |
|---|---|---|---|---|---|
| A. Living and dining | |||||
| 1 | TV unit with back panel, laminate finish | sq ft | 42 | 1,380 | 57,960 |
| 2 | False ceiling with cove lighting channel | sq ft | 260 | 350 | 91,000 |
| B. Kitchen | |||||
| 3 | Base and wall units, 18 mm carcass, acrylic shutters | r ft | 14 | 24,000 | 3,36,000 |
| C. Master bedroom | |||||
| 4 | Wardrobe 8 ft × 7 ft with loft | sq ft | 56 | 2,000 | 1,12,000 |
| D. Design and supervision | |||||
| 5 | Design, drawings and site supervision | lump sum | 1 | 75,000 | 75,000 |
| Sub-total (excl. GST) | 6,71,960 | ||||
Notice that every amount is a quantity multiplied by a rate. A client can follow the logic, and you can revise a single line without rebuilding the document.
4. Material and labour costs
Some designers present rates inclusive of material and labour; others separate them. Both work. What matters is consistency and clarity: if a rate includes hardware, say so; if you supply the stone but the client buys the appliances, say that too.
5. Design fees
State whether your design fee is a separate line, a percentage, or embedded in the item rates. Embedded fees make comparisons harder for the client, and separate fees make it easier to remove or reduce the scope later. Pick the approach that matches how you want to be paid, and say it plainly.
6. Exclusions and assumptions
This section is the cheapest insurance you will ever buy. Examples of exclusions:
- Civil changes, demolition debris removal beyond a stated amount.
- Appliances, loose furniture, curtains and décor unless listed.
- Society deposits, permission charges and lift or parking fees.
- Electricity and water during work.
- Any item not described in the scope.
And assumptions:
- Site is available from a stated date and access during working hours is permitted.
- Walls and floors are in sound condition.
- Client selections are made by agreed dates.
7. Taxes where applicable
Whether GST applies, what rate applies and how to show it depends on your registration and what you supply. This is a tax question, not a design one, so take it to your chartered accountant, and refer to the official GST portal for current rules. If you show GST on the quotation, show the basis and the amounts clearly. InterioDesk treats GST details as optional.
8. Payment terms, validity, revisions and approval
Payment terms
State the milestones and amounts or percentages, for example advance on signing, further instalments on stage completion, and balance on handover. There is no universally correct schedule; choose one that matches cash flow and client trust, and write it down. See managing payments and milestones.
Validity
Material rates change. State how long the quotation is valid, for example 15 or 30 days, and what happens afterwards.
Revision history
Quotations are revised. Keep version numbers and dates, and keep the older versions. When the client approves, record exactly which version they approved.
Client approval
Decide how a quotation is accepted: a signed copy, a written confirmation or an online approval in a portal. Whatever you choose, store the proof with the project.
Common quotation mistakes
- Vague scope. "Wardrobe" can mean three different products at three different prices.
- Missing quantities. A rate without a quantity is not a quotation.
- No exclusions. The client assumes everything is included.
- Per-square-foot only. Fine for a first budget, but too blunt to revise or defend.
- No version control. Two clients, six revisions, one folder called "final".
- Silent changes after approval. Post-approval additions should become priced change requests. See how to handle extra work.
- No acceptance record. A thumbs-up emoji is not a record.
A pre-send checklist
- Quotation number, date and version are correct
- Client and site details are accurate
- Scope is described by room with specifications
- Every line has quantity, rate and amount
- Totals are checked; GST shown only where applicable
- Exclusions and assumptions are listed
- Payment terms and validity are stated
- Acceptance method is stated
- PDF opens correctly and is named by version
A printable version with a blank line-item worksheet is on our quotation checklist page.
How software helps without taking over
Spreadsheets are fine for drafting. Where they struggle is memory: which version was approved, by whom, and what changed. A tool such as InterioDesk's quotation software structures the lines, generates a PDF, keeps each version and records the client's approval so the approved quotation becomes the project's original agreement. It does not set your rates, and the numbers remain your professional judgement.
Pricing approaches and how they affect the document
How you price shapes how you write the quotation. None of these approaches is universally right; each has trade-offs you should understand before you choose.
| Approach | How it works | Watch out for |
|---|---|---|
| Itemised (quantity × rate) | Every item has a quantity and rate | More work to prepare, but easiest to revise and defend |
| Per square foot | One rate for a category, multiplied by area | Hides specification differences; hard to revise line by line |
| Lump sum per room | A fixed price for each room | Disputes if scope inside the room changes |
| Cost plus fee | Actual costs plus a designer percentage or fee | Needs trust and transparent records; clients may want a cap |
Writing line descriptions that prevent arguments
Compare these two descriptions of the same item:
- Weak: "Wardrobe, master bedroom."
- Strong: "Master bedroom wardrobe, 8 ft wide × 7 ft high, 18 mm BWP carcass, laminate shutters (client to select from approved shade card), soft-close hinges and channels, 2 internal drawers, loft excluded."
The strong version tells the client what they get, tells the carpenter what to build and tells you what you promised. It costs a minute to write and can save weeks of discussion.
Using allowances sensibly
When the client has not selected an item, such as lights, tiles or sanitaryware, state an allowance: "Lighting allowance: ₹60,000 (supply only). Selections above this amount will be charged additionally." An allowance makes the quotation complete without pretending to know the choice.
Presenting the total
Show a subtotal by room, then the grand total. Clients like to see where the money goes, and a room-level breakdown lets them trim scope intelligently. If they ask to remove a room, you can reissue the quotation as a new version in minutes.
A short worked revision (illustrative)
| Version | Change | Total (₹) |
|---|---|---|
| v1 | First quotation | 9,40,000 |
| v2 | Kitchen shutters changed from acrylic to laminate | 9,05,000 |
| v3 | False ceiling removed from one bedroom | 8,75,000 |
The client approves v3. If the number is later disputed, v3 is the reference, and the earlier versions explain how the price got there.
Presenting the quotation to the client
The document is only half of the job. How you walk the client through it often decides whether they approve it, negotiate it or take it to a competitor.
- Meet or call firstDo not send a quotation cold. Walk through the scope in a short call so the client hears the logic before they see the number.
- Lead with scope, not priceStart with what is included, room by room, then the total. A price seen without context is compared with the lowest number the client has heard.
- Highlight optionsMark items that can be upgraded or removed, with the price effect. Clients who can trim costs themselves are less likely to ask for a blanket discount.
- Explain exclusions aloudSay what is not included and why. It feels awkward, but it prevents the most expensive misunderstandings.
- Agree the next step and date"I will send the PDF today; shall we speak on Thursday?" Quotations without a follow-up date drift.
Responding to a request for a discount
Discounts are a business choice, not an obligation. If you do give one, link it to something real: a simpler specification, an earlier start, a larger scope or a faster payment schedule. Then issue a new version at the new price and keep the earlier one. Avoid silently lowering rates, because the client will expect the same on every future change.
Quotation versus agreement
A quotation is an offer. Once the client approves a particular version, it becomes the basis of the agreement, and you should treat it that way: record the approved version, the date and the approver, and set the original contract value. Whether that is enough, or you also need a formal signed contract, depends on your practice and legal advice. Many designers use a short contract that refers to the approved quotation by its number and version.
Keeping a library of standard clauses
Write your exclusions, assumptions, validity and extra-work terms once and reuse them. A small library of tested wording saves time and improves consistency, and when a dispute shows a gap, you fix the wording once for all future quotations.
Conclusion
A good quotation is specific about what is included, honest about what is not, easy to follow and easy to revise. Fill in each of the eight sections, keep versions, and record the client's approval. The effort is small compared with a single disputed extra. Next, learn how to calculate your project budget so the quotation you send also protects your margin.
This article is general guidance, not legal, tax or contractual advice. Example prices are illustrative.
General guidance only. This article is not legal, tax or contractual advice. Speak to a qualified professional about your own agreements and GST position.