Interior Design Project Checklist: From Brief to Handover (Printable)

Print one per project and tick as you go. Phases follow the order most Indian interior projects run in.

Run this checklist in InterioDesk
Illustrative interface with sample data

Project name: ________________ Client: ________________ Site address: ________________ Start date: ________

1. Brief and site

  • Client goals, budget range and possession or deadline date recorded
  • Household or user needs noted (children, elders, pets, work-from-home, accessibility)
  • Site measured; photos taken; existing services (electrical, plumbing, AC points) noted
  • Society or building rules checked (working hours, material movement, deposits)

2. Design development

  • Layout options presented and one chosen
  • 3D renders or visuals for key rooms prepared
  • Lighting, electrical and plumbing points marked
  • Furniture and storage requirements confirmed room by room

3. Quotation and agreement

  • Scope written down room by room, with inclusions and exclusions
  • Itemised quotation prepared (quantities, rates, amounts)
  • Payment terms and validity stated
  • Quotation approved; original contract value recorded

4. Approvals

  • Final layout approved by the client
  • Renders and working drawings approved
  • Materials and finishes selected and recorded per room
  • Approved versions shared with site staff and vendors

5. Pre-execution

  • Site team and vendors assigned
  • Sequence of trades agreed
  • Material orders placed for long-lead items
  • Site access, storage and power arranged

6. Execution

  • Regular site updates with photos or video (date and stage noted)
  • Concealed work photographed before covering
  • Quality checks done at the end of each stage
  • Delays communicated to the client early

7. Changes and budget

  • Every extra request logged with price and timing
  • Approval received before extra work starts
  • Revised contract value updated after approved changes
  • Actual costs and estimated final cost reviewed regularly

8. Payments

  • Milestones agreed and matched to progress
  • Each payment recorded with date, mode and reference
  • Overdue amounts followed up politely and in writing

9. Handover

  • Final inspection and snag list completed
  • Warranties, manuals and final drawings collected
  • Client walkthrough done and acknowledgement signed
  • Final payment received; project documents archived
Using this alongside softwareThe same phases map to stages in InterioDesk. See the end-to-end walkthrough or read the full guide to managing an interior design project.

Frequently asked questions

Is this checklist legally required?

No. It is a practical aid, not a legal or regulatory requirement. Adapt it to your contract and project type.