Pre-send checklist
Header and parties
- Quotation number, date and version
- Client name and site address
- Your business name and contact details; GST number if applicable
- Validity period
Scope
- Rooms or work packages listed separately
- Every item has description, unit, quantity, rate and amount
- Brand, finish or specification stated where it affects price
- Dimensions or measurement basis stated
Commercials
- Design fee shown (separately or inside, as agreed)
- GST shown only where applicable, with the basis stated
- Subtotals add up and the grand total is correct
- Payment schedule and mode stated
Protection
- Exclusions listed (for example civil changes, appliances, loose furniture)
- Assumptions listed (for example site access, power, society permissions)
- How extra work is priced and approved
- How the quotation is accepted
Line-item worksheet
| # | Room / package | Description and specification | Unit | Qty | Rate (₹) | Amount (₹) |
|---|---|---|---|---|---|---|
| 1 | ||||||
| 2 | ||||||
| 3 | ||||||
| 4 | ||||||
| 5 | ||||||
| 6 | ||||||
| Total (excl. GST) | ||||||
This worksheet contains no prices. Fill it with your own costing. It is not legal or tax advice.
For what each section means and common mistakes, read how to prepare an interior design quotation in India.